The challenge
The factory wanted to increase furniture-front output within its existing floor space.
Two CNC routers and an edgebander supplied to expand a furniture-front product range.
Year
2023
Delivery time
77 days
Result
38% higher front output without expanding floor space.
The factory wanted to increase furniture-front output within its existing floor space.
We designed the cell configuration, audited the manufacturer before contract and planned the equipment layout around the existing production flow.
Two CNC routers and an edgebander.