The challenge
The plant needed to replace manual marking and increase steelwork output without stopping the operating workshop.
Sourcing and delivery of a 6 kW fibre laser for a steel structures manufacturer, including site audit, customs clearance and two-shift training.
Year
2024
Delivery time
94 days
Result
94-day delivery and a 71% reduction in manual marking.
The plant needed to replace manual marking and increase steelwork output without stopping the operating workshop.
We matched the requirements to the site, verified the manufacturer, modelled delivery and customs costs, then arranged training for two shifts after installation.
A 6 kW fibre laser for sheet-metal cutting.