Two legacy fillers were replaced with a modular TL-PACK 6 line integrated with the client's MES and validated on the first batch.

Year

2024

Delivery time

138 days

Result

65 packs per minute and a 26-month payback.

The challenge

The existing filling equipment constrained line speed and needed replacement without disrupting the production schedule.

Our approach

We selected a modular configuration, agreed MES integration points, checked packaging requirements and validated the first production batch.