The challenge
The existing filling equipment constrained line speed and needed replacement without disrupting the production schedule.
Two legacy fillers were replaced with a modular TL-PACK 6 line integrated with the client's MES and validated on the first batch.
Year
2024
Delivery time
138 days
Result
65 packs per minute and a 26-month payback.
The existing filling equipment constrained line speed and needed replacement without disrupting the production schedule.
We selected a modular configuration, agreed MES integration points, checked packaging requirements and validated the first production batch.
TL-PACK 6 modular packaging line.